In the spring of 2002, Aarsleff carried out one of the biggest CIPP linings ever in Denmark.

The pipeline consisted of a 124-year-old, brick built, oval sewer pipe dimensioned 1,725 x 1,600 mm. The joints of the existing pipe were crumbling, and therefore, the 136 m long pipe did not live up to the functional requirements.

The renewal was executed with a traditional water relining, and the installation lasted approx. five hours. After this, the liner cured for 1½ days followed by a cooling period of another 1½ days. Finally, the 32 laterals to the buildings in the street could be cut free.

During the renewal work, Pipe Technologies established a 140 m long bypass pumping that transported approx. 400 litres of water per second.


Contact
Pipe Technologies Sales
+45 87442222
rortekniksalg@aarsleff.com
Related topics
CIPP lining of main pipes

Local authorities


Copyright © 2010 - Terms of use
Per Aarsleff A/S, Lokesvej 15, 8230 Åbyhøj, Tel +45 8744 2222, Fax +45 8744 2249, Mail:info@aarsleff.com / job@aarsleff.com