|
In connection with the construction of the Copenhagen Metro, Aarsleff designed and constructed a complete cofferdam including pre-drilling, sheet piling, anchoring, underwater excavation as well as casting of underwater tremie concrete. The contract included the construction of a 91m long double cut and cover tunnel.
|
|