Sitemap | Dansk
WWTP 9 towns in Latvia
Front page > Infrastructure projects > References > WWTP 9 towns in Latvia < Back
London Array Offshore Wind
Foundations Horns Rev 2
Installation Horns Rev 2
The Øresund Fixed Link
Port of Muuga
Installation of gas pipelines
Natural gas pipeline in Finland
Road, bridge and tunnel
Underground reservoir
Extension for listed farm
Construction pit
Rebuilding busy intersection
Motorway bridges at Silkeborg
Sewer renewal
District heating work
New oil pier Copenhagen
Large-scale earthmoving
Mine clearance at Skallingen
WWTP 9 towns in Latvia
No-Dig in Latvia
Pumping stations in Ukraine
WTP/WWTP Rezekne Latvia

Aarsleff was awarded a turnkey contract for design and construction of nine wastewater treatment plants in the eastern part of Latvia. The contract works included all civil, mechanical and electrical/SCADA works as well as commissioning, training and testing of all equipment.

 

The wastewater treatment plants are located in the cities of: Valmiera, Cesis, Sigulda, Salaspils, Limbazi, Livani, Aluksne, Dagda and Kegums.

 

Works under the contract

Construction of 9 wastewater treatment plants with a total capacity of 162,000 PE. The operation of the wastewater treatment plant is automatic and controlled by SCADA.

 

Pretreatment sections with mechanical equipment and aerated sand traps.

 

Tanks for biological treatment for N and P removal.

 

SS tanks for settling of sludge and solids.

 

Dewatering of sludge by means of belt press.


Contact
Export Manager
Peter Godrim
+45 8744 2410