Sitemap | Dansk
Sea crossing
Front page > Infrastructure projects > References > Sea crossing < Back
Nysted Offshore Wind Farm
The Øresund Fixed Link
Port of Klaipeda
New marina near Rostock
Extension of Port of Århus
Sea crossing
Main road in Tanzania
New bridges in Ørestad
Motorway in Sweden
Railway in Sweden
Lighting and ground works
New airport at Billund
Gas pipeline in Norway
New gas treatment plant
Cable works
Pipe rehabilitation in Russia
Pipe rehabilitation in India
Water supply in Vietnam
Water project in Latvia
Cofferdam for Metro
Cofferdam for opera house
Metro forecourts
Land development project

In connection with installation of district heating mains from Vendsyssel District Heating Plant to Aalborg District Heating Plant, Aarsleff performed a crossing of the Liim Fiord with two district heating mains.

Aarsleff performed the sea crossing by pulling pipelines at the bottom of an excavated pipe trench. The pipe trench was, at water depths below 1 m, excavated from shore and at depths exceeding 1 m, excavations were executed from a dredger placed on a jack-up platform controlled by satellite equipment.

The pipes were welded and pressure tested on shore. The two district heating mains were then pulled through the casing pipes by means of a specially developed method enabling the pulling to take place without wear and tear on the vulnerable HDPE jacket pipe.

On the opposite side of the Liim Fiord a winch was set up. From here a wire was placed in the excavated pipe trench by boat and controlled by divers. The wire was finally attached to the pipeline and the pulling was performed by using the bottom-pulling method.


Contact
Divisional Manager
Peter B. Nordheim