|
Aarsleff rehabilitates pressure pipes, i.e. drinking water, process and gas pipes, by means of various trenchless methods.
The work carried out before and during trenchless rehabilitation may, for instance, include:
- TV-inspection
- Slope measurement
- Analysis of and consultancy on choice of dimensions and rehabilitation methods.
If the Aarsleff Tube is included in the job, the tube is produced to size at our factory according to the job in question and to the receipts complying with the specific requirements for resistance. Aarsleff also implements flushing and offers information on and planning of the rehabilitation work so that it can be carried out with a minimum of inconvenience for the surroundings, i.e. businessmen, residents, traffic and the police.
The post-renovation work offered by Aarsleff includes:
-
Quality tests carried out at our laboratory
-
The preparation of documentative material concerning the completed renovation job
-
For TV-inspections, electronic documentation and a written report.
Aarsleff offers long-term planning of preventive maintenance, long-term maintenance plans and budgets, renovation plans as well as a concept for multi-annual framework agreements and operating contracts.
|
|