Sitemap | Dansk
WTP/WWTP Rezekne Latvia
Front page > Infrastructure projects > References > WTP/WWTP Rezekne Latvia < Back
London Array Offshore Wind
Foundations Horns Rev 2
Installation Horns Rev 2
The Øresund Fixed Link
Port of Muuga
Installation of gas pipelines
Natural gas pipeline in Finland
Road, bridge and tunnel
Underground reservoir
Extension for listed farm
Construction pit
Rebuilding busy intersection
Motorway bridges at Silkeborg
Sewer renewal
District heating work
New oil pier Copenhagen
Large-scale earthmoving
Mine clearance at Skallingen
WWTP 9 towns in Latvia
No-Dig in Latvia
Pumping stations in Ukraine
WTP/WWTP Rezekne Latvia

Aarsleff was awarded a turnkey contract for design and construction of a water treatment plant and a wastewater treatment plant in Rezekne, Latvia. The contract works included all civil, mechanical and electrical/SCADA works as well as commissioning, training and testing of all equipment.

 

Works under the contract

Construction of a fully automatic water treatment plant with a capacity of 8,000m³/d. Raw water to the plant is supplied from 4 boreholes all located at a well field 3 km away from the plant. The operation of the water treatment plant is automatic and controlled by SCADA. The quality of the drinking water complies with EU Directive 98/83EC.

 

Construction of a wastewater treatment plant with a capacity of 52,300 PE. The operation of the wastewater treatment plant is automatic and controlled by SCADA.

 

Pretreatment section with mechanical equipment and aerated sand trap.

 

Tanks for biological treatment for N and P removal.

 

SS tanks for settling of sludge and solids.

 

Dewatering of sludge by means of a centrifuge.


Contact
Export Manager
Peter Godrim
+45 8744 2410
pgo@aarsleff.com
Related topics
Water treatment


Copyright © 2012 - Terms of use
Per Aarsleff A/S, Lokesvej 15, 8230 Åbyhøj, Tel +45 8744 2222, Fax +45 8744 2249, Mail:info@aarsleff.com